How Long Does a House Extension Take?

Matt Keane
January 10, 2023

Contemplating a house extension can leave you fraught with questions, primarily: how long does it take? As homeowners ourselves, we understand that this uncertainty can be daunting - after all, projects like these tend to disrupt everyday life.

Based on our comprehensive research and personal experiences, we'll give you a reliable idea of the overall timeline for building an extension. So, let's dive right into unearthing what influences the duration of your house extension project.

Key Takeaways

  • The duration of a house extension project can be influenced by factors such as the preparatory phase, design phase, planning phase, technical design phase, party wall agreement, tender process, and building phase.
  • On average, a single - storey house extension takes around 3 to 4 months to complete, while a double storey or larger rear extension may take between 4 and 6 months.
  • To minimise the duration of a house extension project, it is important to plan meticulously and communicate clearly with all parties involved. Hiring experienced professionals and obtaining necessary approvals in advance also contribute to a smooth and timely construction process.

Factors Affecting the Duration of a House Extension

The preparatory phase, design phase, planning phase, technical design phase, party wall agreement, tender process, and building phase are some of the variables that can affect how long a house extension takes.

Preparatory Phase (2-4 weeks)

The house extension starts with a preparatory phase. It lasts for around 2 to 4 weeks. This stage is very important. We must prepare the site for construction work during this time.

The area gets cleared of any waste or debris and marked out for building needs. In some cases, we may need to protect nearby trees or plants too!

Design Phase (2–5 weeks)

During the design phase of a house extension project, we work closely with professionals, such as architects and designers, to create detailed plans for the extension. This phase typically takes between 2 and 5 weeks to complete.

We consider factors like the size and layout of the extension, as well as any specific features or requirements you have in mind. It's important to remember that this timeline does not include site preparation or actual construction work.

The design phase is crucial for ensuring that all aspects of your extension are carefully considered and planned before moving forward with obtaining the necessary approvals and starting construction.

Planning Phase (8–10 weeks)

During the planning phase of a house extension, which typically takes 8–10 weeks, we work closely with architects and designers to create detailed plans for your project. This involves determining the layout, size, and features of the extension.

We also consider any necessary permits or approvals that may be required before construction can begin. It's important to take this time to ensure that all aspects of the project are carefully planned out to avoid delays or issues later on.

Technical Design Phase (1-2 months)

During the technical design phase, our team will work closely with you to create detailed architectural plans and specifications for your house extension project. This phase typically takes around 1–2 months to complete.

During this phase, we will consider factors such as structural integritybuilding regulations, and material selection. Our goal is to ensure that the design meets your requirements and is structurally sound.

Once the technical design is finalised, we can move forward with obtaining the necessary approvals and permits before starting the construction phase.

Party Wall Agreement (1 week–3 months)

During the construction of a house extension, you may need to consider a Party Wall Agreement. This is an agreement between you and your neighbours regarding any shared or adjoining walls.

The process of obtaining this agreement can take anywhere from 1 week to 3 months. It involves notifying your neighbours about the proposed works, allowing them time to review the plans, and potentially negotiating any necessary terms or conditions.

It's important to factor in this timeframe when planning your extension project to ensure all legal requirements are met before proceeding with the construction phase.

Tender Process (2-4 weeks)

During the tender process, contractors and builders will provide you with quotes for your house extension project. This typically takes around 2 to 4 weeks. It's important to gather multiple quotes from different professionals to ensure you're getting a fair price for the work.

The tender process allows you to compare costs, timelines, and expertise before making a decision on who will build your extension. Remember that while price is an important factor, it's also crucial to consider the quality of work and experience of the builders.

Building Phase (2-4 months)

During the building phase of a house extension, the actual construction work begins. This is where your plans start to become a reality! It typically takes around 2–4 months to complete this phase.

The length of time can vary depending on the size and complexity of your extension. The builders will focus on tasks such as laying foundationserecting wallsinstalling windows and doors, and adding any necessary plumbing and electrical systems.

They will also take care of finishing touches like painting and flooring. Keep in mind that this timeframe does not include the design and planning phases, which may add extra time to the overall project.

Typical Time Frames for Different Types of House Extensions

Single Storey Extension: Takes approximately 3–4 months to complete, depending on the size and complexity of the project.

Double Storey or Larger Rear Extension: Requires a longer time frame of around 4-6 months due to the additional work involved.

Curious about how you can minimise the duration of an extension? Keep reading for helpful tips!

Single Storey Extension: 3–4 months

A single-storey extension typically takes around 3 to 4 months to complete. This timeframe is based on the average duration of construction for a straightforward and small-scale extension project.

It's important to note that this estimate does not include the design and planning phases, which can add additional time to the overall project. The actual duration may also vary depending on factors such as site preparation, obtaining necessary approvals, and proper project management.

If you're considering a single-storey extension for your home, it's advisable to consult with professionals who can provide accurate estimates and guidance specific to your project.

Double Storey or Larger Rear Extension: 4-6 months

For Irish homeowners considering a double storey or larger rear extension, it's important to be aware that this type of project typically takes between 4 and 6 months to complete. This timeframe includes the construction phase, which involves building the extension from start to finish.

It's worth noting that this duration doesn't take into account the design and planning stages, as well as any additional time required for obtaining necessary permissions. Building a double storey or larger rear extension requires careful consideration and expert guidance, so consulting with professionals is crucial for accurate estimates and the successful completion of your project.

Designing and constructing a double storey or larger rear extension for your home in Ireland can take approximately 4 to 6 months. This timeline covers the actual construction work involved in building the extension itself.

However, it's essential to remember that this estimated duration excludes the earlier stages, such as designing and planning, as well as acquiring any required permits or approvals.

Design and Planning Phases: Additional timeframes

During the design and planning phases, additional timeframes need to be considered before the construction of your house extension can begin. These phases typically take between 2 to 5 weeks for the design phase and 8 to 10 weeks for the planning phase.

It is important to note that these timeframes are separate from the actual building phase and should be accounted for in your overall timeline. Planning permission may also be required, which can add further time to this process.

Working with professionals such as architects and builders will help ensure that these crucial stages are completed efficiently and effectively.

Tips for Minimising Extension Duration

To minimise the duration of your house extension, it is crucial to plan meticulously and maintain clear communication with all parties involved. Hiring experienced professionals, obtaining necessary approvals in advance, and implementing proper project management techniques will also contribute to a smooth and timely construction process.

Detailed planning and clear communication

To ensure a smooth and efficient house extension project, it is crucial to have detailed planning and clear communication. This means taking the time to carefully plan every aspect of the extension, from design to construction.

By having a clear idea of what you want to achieve and communicating your requirements effectively with your architect or builder, you can minimise delays and confusion. Proper planning also involves considering factors like obtaining necessary approvals in advance and managing your budget effectively.

Clear communication throughout the project will help everyone involved understand expectations, deadlines, and any changes that may arise. Remember, good planning and open communication are keys to successfully completing your house extension on time.

Hiring experienced professionals

When it comes to building a house extension, hiring experienced professionals is crucial. They have the knowledge and expertise to handle the complexities of the construction process.

With their guidance, you can avoid costly mistakes and ensure that your project stays on track.

Experienced professionals, such as architects and builders, understand local regulations and can help you obtain the necessary approvals in advance. They also have established relationships with suppliers and subcontractors, which can speed up the construction timeline.

By hiring experts who specialise in house extensions, you can save time and minimise delays. Their attention to detail and proper project management will ensure that everything runs smoothly from start to finish.

Obtaining necessary approvals in advance

Before starting your house extension project, it's important to obtain all the necessary approvals in advance. This includes obtaining planning permission if required and getting any other permits or licences that may be needed.

Planning permission can take up to 8–10 weeks to secure, so it's best to apply for it as early as possible. By taking care of these approvals ahead of time, you can avoid delays and ensure a smooth construction process.

Remember, consulting with professionals such as architects and builders can help guide you through this process and provide accurate estimates for your specific project.

Proper project management

Proper project management is crucial for ensuring the smooth and timely completion of a house extension. It involves overseeing all aspects of the project, from coordinating with architects and builders to managing budgets and schedules.

By having a dedicated project manager in place, homeowners can benefit from efficient communicationtransparent decision-making processes, and proactive problem-solving. This helps to minimise delays, prevent costly mistakes, and ensure that the extension is completed within the estimated timeframe.

With proper project management, homeowners can have peace of mind knowing that their house extension is being handled professionally and effectively.

Ready to Extend Your Home? Get Expert Advice Today!

In conclusion, the duration of a house extension can vary depending on several factors, such as size, complexity, and planning. On average, a single-storey extension can take around 6–8 weeks to complete, while larger or double-height rear extensions may take up to 6 months.

It is important to consider these timelines and consult with professionals for accurate estimates and guidance on your specific project.

Contact us today!

Contact Us Today For a Customized Consultation For your Home Improvement Project

Contact BuildTech Now!

Fill out the form below and we’ll get back to you!

Check - Elements Webflow Library - BRIX Templates

Thank you

Please check your inbox to download your Free EBook!
Oops! Something went wrong while submitting the form.
*FYI, parts of this blog post were drafted by artificial technlogy. But rest assured, it's been thoroughly researched, edited, reviewed and me & my team.

How to clone into other project?

  • Press "Ctrl + E" or "Cmd + E" in the Designer and enable "Select on-page element".

  • Search for the class named, "Cloneable Area".

  • Copy the element inside this container to your own project.

  • Rename the classes accordingly if they are clashing with your project.

  • Ensure custom code from the in-page setting has been copied into your project as well (if there's any).

  • 'Page Trigger' interaction can't be copied directly. You can only clone the whole project, or rebuild it.
    A simple trick to copy the 'Page Trigger' interaction into another project is as below:

    1. Create a dummy element.
    2. Apply any type of 'Element trigger' into the dummy element and select the 'Page Trigger' animation.
    3. Copy the dummy element with the animations applied into your new project.
    4. The animation should have been copied into your project and you can reapply the 'Page Trigger' animation into your project.

  • If you have further inquiry or need assistance, feel free to contact us.

  • Lastly, please do not copy this project and claim it as your own. We wish to continue sharing and giving to the community. In order to do so, we will need your cooperation and full support. Thank you very much,